Track Chain for BAUER MC128 Crawler Crane

3
4
s1
s3
/3
/4
/s1
/s3

Track Chain for BAUER MC128 Crawler Crane

BAUER MC128 track chain is one of the undercarriage parts of BAUER MC128 crawler crane. With the track shoe, track bolt and nut, it assembles a track link assembly. Its good quality can extend the service life of machine.

Specifications

Goods description Track chain, track link
Suitable model BAUER MC128
Place of origin Yantai, China
Heat treatment Whole quenching and tempering, then surface hardening
Colour Black, blue or as require
Packing Plywood pallet /case, Iron pallet
Loading port Yantai, Qingdao, Shanghai, Guangzhou, Yiwu, etc.
Trade term EXW, FOB, CFR, CIF, DDU, DAP
MOQ 1 piece
Lead time 25 - 30 days
Warranty time 1 year

Structural

Structural

Generally speaking, a complete track chain is composed of several main parts, shaft, bushing, chain plate and seal. Obviously, the structure of the chain determines that it mainly plays the role of traction or transmission. The outer surface of the bushing wears faster than the inner surface. And the shaft is required to have the ability to withstand the constant tensile stress of the track chain and have high strength to prevent wear.

Description & Advantages

Forging heating, sustainable quality, high hardness and strong toughness.

  • Forging technique. Adopt forging heating, ensure the track chain not easy to break.

  • Sustainable quality. Exquisite workmanship and good appearance, sustainable quality, long service life.

  • High hardness and strong toughness. Has both high hardness and strong toughness, meet the needs of different working environments.

 

Production

Production

 

Production

Packages

Packages

The track chain is usually packed with plywood pallet or iron pallet, 2 track chains on one pallet for one unit machine. The pallet we use all meet the export standard and are strong enough to ensure the security of all track chains. After track chains arrival, it is also easy to operate to ship from the destination port to customer’s yard.

 

Shipping Methods

Shipping Methods

Multiple shipping options, usually by sea, some times according to customer’s address will by railway. Also determined by the track chain weight and size, strive to make sure each customer to receive the goods at their convenience and shortest time.

FAQs

  • Can we use our own shipping agent?

    Yes, you can. We cooperate with many forwarders. If you need, we can recommend some forwarders to you and you can compare the price and service.

  • What is your delivery time?

    If there are any parts in stock , our delivery time is only 0-7 days. For customised products: usually within 25 days of production.

  • Which shipment way does your company provide?

    Sea, train, truck, air, express.

  • What about Quality Control?

    For all products, we have a complete QC system. From the selection of raw materials for products - production process and equipment - quality inspection before delivery, all processes are strictly controlled until the completion of packaging to ensure high-quality products for customers.

  • What is your terms of packing?

    We will choose the most appropriate packaging method for each product. In general, we use plywood pallet, steel pallet, plywood case.

CAN'T FIND THE MODEL YOU NEED?

Provide Parts Manual We Can Customize For You!