2025 May Day Holiday Notice

Dear Customers,
Please be advised of our operational schedule during the upcoming May Day holiday period. In accordance with national regulations and our company’s specific arrangements, the holiday details are as follows:
Holiday Period: Wednesday, May 1st, 2025 to Sunday, May 5th, 2025 (5 days total).
Online Service: We are pleased to inform you that our team will remain available online throughout the holiday period to provide real-time support and service. Please feel free to reach out to us with any inquiries.
Shipment Information: Please note that shipments may experience some delays due to the holiday closure. We sincerely apologize for any inconvenience this may cause. All pending shipments and orders will be processed as promptly as possible once we resume regular operations on Tuesday, May 6th, 2025.
Thank you for your understanding and continued support.
We wish you all a very happy holiday, smooth work, and a happy family!
Sincerely,
Yantai Orient
Related News
A regular customer ordered Doosan DX480 undercarriage parts. Thanks for the customer’s trust and long-standing cooperation. It lets us have enough motivation to improve the product quality and our service. Everyone in our team is dedicated to their duties as always, until the goods are shipped.
Shipment of Crawler Crane Sumitomo LS118RH3 Insert Boom Date: 22th, August, September, 2022 Description of Goods:
Dubai blue sky hotel project is the highest hotel building in the world, covering an area of 3662 square meters and a building area of about 102000 square meters. It includes 1100 hotel rooms, 320 meters high-altitude open-air swimming pool, 360 meters high-altitude restaurant and 5-level high atrium hanging garden. The structural design is complex, the construction is difficult and very cumbersome.
Shipment of CAT D4H Bulldozer Swamp Shoe Date: 11th, February, 2021 Description of Goods: 142 Piece of CAT D4H Bulldozer Swamp Shoe Total Weight: 3 TONS
Wear of the crawler track. Wear between the track pin and the pin bushing is inevitable, but this wear will stretch the track pitch and make the track too large. If this wear continues, the track will move sideways, causing wear on the idler, track rollers, and sprockets, while also exacerbating the wear on the track pin and bushing.
In the grand blueprint of infrastructure construction, every rotary drilling rig plays a crucial role. But have you ever wondered why some equipment can operate consistently and efficiently under harsh working conditions, while others frequently malfunction? The answer often lies in unnoticed details, such as the unsung hero of the rotary drilling rig – the chain guard.
Tired of constant downtime and rising maintenance costs caused by undercarriage failures? We understand how critical reliable undercarriage components are to your operations. That’s why we supply top-quality Mait HR180 undercarriage parts engineered for durability, performance, and seamless integration.
A regular customer from the United Arab Emirates, cooperating for many years, has been buying parts from us continuously. Recently, they ordered 2 complete sets of KR806-4 undercarriage parts, some are customized parts with drawings. Now all the goods have been sent to Qingdao port, have been released from customs, just waiting for the vessel departure.
As a supplier of undercarriage parts for rotary drilling rigs, we understand that customization is key to enhancing performance and longevity. To streamline the process and ensure precision, here’s how we optimize customization based on your specific needs:
Date: 21th, January, 2021 Description of Goods: Sumitomo LS118RM Crawler Crane: Boom Insert 6m, Boom Insert 3m, Boom Top (with 7 pulleys, bearings, 2 axis), Boom Bottom. Total Weight: 3 Tons Load: All 4PCS BOOMS ARE LOADED IN 2 40HC CONTAINERS Packaged Photos: