High-quality Soilmec SR70 Undercarriage Parts Are Ready For Shipment
Our high-quality Soilmec SR70 undercarriage parts are now ready for shipment.
Date: 21th,July, 2023
Description of Goods:
Track Link Assembly, Track Roller, Carrier Roller, Track Shoes, Idler, Sprocket.
Total Weight: 25000KGS
Package: 26Packages
Measurement: 18CBM
We specialize in producing high-quality rotary drilling rig undercarriage parts that are suitable for various renowned brands, such as Bauer, Soilmec, Casagrande, IMT, CMV, Mait, Sany, XCMG, Zoomlion, Sunward, Liebherr, etc.

Designed to meet the toughest demands of the industry, these parts are guaranteed to deliver exceptional performance and durability. Whether you require track chains, sprockets, or rollers, our comprehensive range of undercarriage parts has got you covered. Engineered with precision and manufactured with the finest materials, our products are built to withstand the most challenging worksite conditions.

Our dedicated team is committed to providing excellent customer service and timely delivery. We understand the importance of minimizing downtime, and that’s why we strive to fulfill orders promptly and efficiently. Rest assured that your order will be well-packaged and securely shipped to your location.
Related News
Yantai Orient's Recent Full Container Shipment of Undercarriage Parts ·Container Size: 20'GP ·Main Products: Track Shoes, Track Rollers, Carrier Rollers, Idlers, Sprockets and Track Chains. ·Types of Machinery We Supply: Rotary Drilling Rigs, Crawler Cranes, Bulldozers And Mining Excavators.
Yantai Orient will participate in the 2023 CTT EXPO held in Moscow from May 23rd to 26th. Today, Yantai Orient is actively organizing the exhibition and preparing for tomorrow's exhibition. We sincerely invite you and your company to meet at booth 14-356.
The first maintenance time for diesel engines is 100 hours, and thereafter every 250 hours, the oil filter and oil should be replaced. The Gear oil shall be replaced every 500 hours, and the Gear oil in the large box shall be replaced every 1000 hours. The hydraulic oil is filtered every 500 hours, replaced completely within the first 1500 hours, and replaced every 2500 hours thereafter (including filter replacement).
1. Tensioning cylinder failure. Check if there is no lubricating oil in the tensioning cylinder and if there is any oil leakage. 2. The track is severely worn. Long term use can also cause the wear of chain ribs and chain barrels on the track to cause the track to detach. 3. The chain protector is worn. Chain protectors play a very important role in preventing chain detachment, so it is important to check whether the chain protectors are worn.
1. High work efficiency: With the function of integrating drilling and grouting, the work efficiency is high, which can greatly shorten the construction cycle. 2. High safety: simple and convenient operation, which can avoid safety accidents caused by operational errors.
The high temperature of rotary excavators is generally divided into high gearbox temperature; Hydraulic oil temperature is too high; The engine coolant temperature is too high. 1. Gearbox temperature is too high: The main reasons are that the size and shape of the bearings, gears, and housing are not standard enough, the lubricating oil is not qualified, or the oil level is not suitable.
1. Maintain the undercarriage parts properly. Properly adjusting the tension of the track shoe assembly and timely cleaning the soil adhering to the undercarriage walking device can reduce walking resistance and reduce walking fuel consumption.
On May 15th, the third Changsha International Construction Equipment Exhibition (CICEE) came to an end. As the largest construction Equipment exhibition in Asia this year, Changsha presented a beautiful answer sheet.
The drive wheels of a rotary drilling rig mainly transmit power through meshing with the crawler, thus enabling the walking and movement of the drilling rig.
On 31 March, the world’s largest-tonnage range-extended rotary drilling rig was officially launched in China, marking the industry’s formal entry into a new era of ‘electrification and commercialisation’. This launch provides a brand-new solution for green infrastructure construction worldwide.