Shipment of Bauer BG28 Rotary Drilling Rig Undercarriage Parts
Date of Shipment: September 22, 2024
Description of Goods:
We are excited to confirm the shipment of high-quality undercarriage parts for Bauer BG28 Rotary Drilling Rigs. These components are essential for optimizing performance and extending the lifespan of your equipment.
Included in the Shipment:
Front Idler (Quantity: 1)
Sprocket (Quantity: 1)
Track assemble (Quantity: 2)
Bottom Roller (Quantity: 12)
Total Quantity: 16 Pieces
Packaging Information:
All 16 pieces of Bauer Rotary Drilling Rig undercarriage spare parts have been meticulously packed into 5 separate packages for safe transport and convenient handling.
Product Advantages:
Durability: Designed to withstand harsh drilling conditions, ensuring longevity.
Efficiency: Enhanced performance leads to reduced downtime and increased productivity.
Compatibility: Perfectly suited for Bauer BG28 models, ensuring seamless integration.

For more details on specific adjustments and maintenance practices, consult another article or contact a qualified technician.
If you have any inquiries about Drilling Rig Undercarriage Parts, such as track shoes, track chain assembly, track roller, carrier roller, sprocket, and idler, please feel free to contact us.
Related News
The 2022 world industrial design conference (WIDC) opened in Yantai, Shandong Province, and the 2022 China Excellent Industrial Design (CEID) award ceremony was held at the same time. CEID is the only national government award in the field of industrial design in China, advocating the deepening application of original design, advanced design concepts and tools, and promoting the high-quality development of industrial design and manufacturing. The 3215 products recommended by CEID in 2022 cover 14 industries in three categories: mechanical equipment, electronic information and consumer goods.
Shipment of Volvo EC480 Bucket Teeth Description of Goods: Excavator Volvo EC480 Bucket Teeth Surface Treatment: Yellow Painted or Customer's Request
On January 26, 2008, the WK-55 electric rope shovel developed by TZCO was shipped out of the factory for surface stripping operation in Pingshuo open pit coal mine. This is a super large open-pit mining equipment, it weighs 1458 tons and is more than seven floors high. WK-55 can excavate 12 million m3 of coal every year. Workers standing in front of it can only reach half of the track height.
1. Bucyrus company was founded in 1880 and launched the first rail type (non rotating) steam excavator in 1882. In 1893, the company's headquarters moved from Bucyrus, Ohio, to South Milwaukee, Wisconsin. Between 1904 and 1914, there were 77 steam shovels manufactured by Bucyrus, which participated in the construction of the Panama Canal. Since then, it has successively merged several steam shovel companies. In 1927, Bucyrus merged with Erie Steam Shovel Company and the company was renamed Bucyrus-Erie (B-E). By 1929, Bucyrus had produced more than 10000 excavators and cranes, becoming one of the world's largest manufacturers of mining machinery. In 1930, Bucyrus merged British Ruston Hornsby Company and began to shift from steam shovels to electric shovels. By 1948, the number of Bucyrus products had exceeded 74000. In 1969, Bucyrus produced the world's largest 4250W walking dragline, which weighed 12258 tons and had an amazing capacity of 168.2 m3! In 1981, Bucyrus began to use the first generation AC power supply system on the 395B electric shovel. In 1997, it merged Marion Power Shovel Company--the world's second largest dragline manufacturer.
Shipment of SANY SCC3200 Plate Rod Date: 27th, October, 2022 Description of Goods: SANY SCC3200 Crawler Crane Plate Rod Quantity:190 PCS Total Weight: 9.5 TONS Product Picture:
Shipment of Rotary Drilling Rig BAUER BG18 Kelly Bar Date: 19th, October, 2022 Description of Goods: Kelly Bar for BAUER BG18 Rotary Drilling Rig: BK18/368/3/24 Total Weight: 5 Tons Load: ALL ONE PIECE KELLY BAR IS LOAD IN ONE 40’ FULL CONTAINER. Packaged Photos:
Rotary drilling rig is a kind of construction machinery for soil borrowing and bored pile, which is widely used.
Date: 29th, September, 2022 Description of Goods: Jintai SD28W: Kelly Lock, Kelly Strips/ Ribs 150m, Terminal Joint For 1st Element, Terminal Joint For 2nd Element, Collar For 2nd Element, Collar For 3rd Element. Jintai SD20: Collar For 2nd Element, Collar For 3rd Element.
Recently, the pile foundation construction of Chongqing East Railway Station Comprehensive Transportation Hub Project is hot. More than 30 rotary drilling rigs were deployed to "take root" downward, tamping the foundation platform and erecting beams for the first comprehensive transportation hub new city in Chongqing.
Date: 22th, August, September, 2022 Description of Goods: Sumitomo Crawler Crane LS118RH3 Insert Boom Total Weight: 700 kgs Load: ALL ONE PIECE INSERT BOOM IS LOAD IN ONE 40' CONTAINER Packaged Photos: