Shipment of Bauer BG28 Rotary Drilling Rig Undercarriage Parts
Date of Shipment: September 22, 2024
Description of Goods:
We are excited to confirm the shipment of high-quality undercarriage parts for Bauer BG28 Rotary Drilling Rigs. These components are essential for optimizing performance and extending the lifespan of your equipment.
Included in the Shipment:
Front Idler (Quantity: 1)
Sprocket (Quantity: 1)
Track assemble (Quantity: 2)
Bottom Roller (Quantity: 12)
Total Quantity: 16 Pieces
Packaging Information:
All 16 pieces of Bauer Rotary Drilling Rig undercarriage spare parts have been meticulously packed into 5 separate packages for safe transport and convenient handling.
Product Advantages:
Durability: Designed to withstand harsh drilling conditions, ensuring longevity.
Efficiency: Enhanced performance leads to reduced downtime and increased productivity.
Compatibility: Perfectly suited for Bauer BG28 models, ensuring seamless integration.
For more details on specific adjustments and maintenance practices, consult another article or contact a qualified technician.
If you have any inquiries about Drilling Rig Undercarriage Parts, such as track shoes, track chain assembly, track roller, carrier roller, sprocket, and idler, please feel free to contact us.
Related News
As a supplier of undercarriage parts for rotary drilling rigs, we understand that customization is key to enhancing performance and longevity. To streamline the process and ensure precision, here’s how we optimize customization based on your specific needs:
Date: 21th, January, 2021 Description of Goods: Sumitomo LS118RM Crawler Crane: Boom Insert 6m, Boom Insert 3m, Boom Top (with 7 pulleys, bearings, 2 axis), Boom Bottom. Total Weight: 3 Tons Load: All 4PCS BOOMS ARE LOADED IN 2 40HC CONTAINERS Packaged Photos:
Recently we got feedback from one of our customer. They said the CAT D9R undercarriage parts all successfully installed.
At Yantai Orient, we don’t just manufacture drilling rig track rollers—we engineer reliability. Every component we produce is built to withstand the harshest job site conditions, ensuring maximum uptime and performance for your heavy machinery.
Date: 4th, December, 2020 Description of Goods: KOBELCO CKE2500 Crawler Crane Jib Parts: Bottom Jib Section (JJ13A00015F1), Upper Jib Section (JJ14A00011P1), Jib Struct Assy (JN16A000192). Total Weight: 1 Ton Load: All 3PCS JIB PARTS ARE PACKED IN 1 20' FULL CONTAINER. Packaged Photos:
Date: 13th, November, 2020 Description of Goods: One Piece of Fuwa Quy80 Crawler Crane Swing Bearing Total Weight: 1000 KGS Package: PALLETS Product Photos:
When it comes to undercarriage parts for heavy machinery, durability and performance are key factors that customers care about most. One of the crucial reasons why our track rollers stand out in the market is the advanced oiling process we use during production. Proper lubrication plays a decisive role in the lifespan and working efficiency of track rollers, and we go above and beyond the standard to ensure every product delivers long-term value for our customers.
SANY SCC1000C Crawler Crane Lattice Boom Section: 3m Boom Insert (Part Number: 10101320), 7m Boom Bottom (Part Number: 10096254), 9m Boom Insert (Part Number: 10101285). Total Weight: 4 TONS
After about 30 days’ production time, with the joint efforts of our team in Yantai Orient, production, technique, operation and shipment team, we successfully ship all the goods to customer in Mexico.
Shipment of Volvo EC460 Bucket Teeth Description of Goods: