Shipment of Crawler Crane Fuwa QUY80 Swing Bearing
Date: 13th, November, 2020
Description of Goods:
One Piece of Fuwa Quy80 Crawler Crane Swing Bearing
Total Weight: 1000 KGS
Package: PALLETS
Product Photos:

Related News
All these crawler parts are manufactured with advanced forging processes and strict heat treatment procedures. Optimized material selection greatly improves wear resistance and loa
The first maintenance time for diesel engines is 100 hours, and thereafter every 250 hours, the oil filter and oil should be replaced. The Gear oil shall be replaced every 500 hours, and the Gear oil in the large box shall be replaced every 1000 hours. The hydraulic oil is filtered every 500 hours, replaced completely within the first 1500 hours, and replaced every 2500 hours thereafter (including filter replacement).
Our high-quality Soilmec SR70 undercarriage parts are now ready for shipment. Date: 21th,July, 2023 Description of Goods: Track Link Assembly, Track Roller, Carrier Roller, Track Shoes, Idler, Sprocket. Total Weight: 25000KGS Package: 26Packages Measurement: 18CBM
Congratulations! We are thrilled to announce that our company has successfully completed the production of high-quality slewing bearings and has recently shipped them to Europe. The technology and engineering expertise invested in the manufacturing process ensure that our bearings meet the highest industry standards and will deliver exceptional performance.
Congratulations! We are thrilled to announce that our company has successfully completed the production of high-quality slewing bearings and has recently shipped them to Europe. The technology and engineering expertise invested in the manufacturing process ensure that our bearings meet the highest industry standards and will deliver exceptional performance.
Yantai Orient's Recent Full Container Shipment of Undercarriage Parts ·Container Size: 20'GP ·Main Products: Track Shoes, Track Rollers, Carrier Rollers, Idlers, Sprockets and Track Chains. ·Types of Machinery We Supply: Rotary Drilling Rigs, Crawler Cranes, Bulldozers And Mining Excavators.
Yantai Orient will participate in the 2023 CTT EXPO held in Moscow from May 23rd to 26th. Today, Yantai Orient is actively organizing the exhibition and preparing for tomorrow's exhibition. We sincerely invite you and your company to meet at booth 14-356.
The first maintenance time for diesel engines is 100 hours, and thereafter every 250 hours, the oil filter and oil should be replaced. The Gear oil shall be replaced every 500 hours, and the Gear oil in the large box shall be replaced every 1000 hours. The hydraulic oil is filtered every 500 hours, replaced completely within the first 1500 hours, and replaced every 2500 hours thereafter (including filter replacement).
1. Tensioning cylinder failure. Check if there is no lubricating oil in the tensioning cylinder and if there is any oil leakage. 2. The track is severely worn. Long term use can also cause the wear of chain ribs and chain barrels on the track to cause the track to detach. 3. The chain protector is worn. Chain protectors play a very important role in preventing chain detachment, so it is important to check whether the chain protectors are worn.
1. High work efficiency: With the function of integrating drilling and grouting, the work efficiency is high, which can greatly shorten the construction cycle. 2. High safety: simple and convenient operation, which can avoid safety accidents caused by operational errors.