Shipment of Crawler Crane Sumitomo LS118RH3 Insert Boom
Shipment of Crawler Crane Sumitomo LS118RH3 Insert Boom
Date: 22th, August, September, 2022
Description of Goods:
Sumitomo Crawler Crane LS118RH3 Insert Boom
Total Weight: 700 kgs
Load: ALL ONE PIECE INSERT BOOM IS LOAD IN ONE 40' CONTAINER
Packaged Photos:

Related News
Shipment of Crawler Crane Sumitomo LS118RH3 Insert Boom Date: 22th, August, September, 2022 Description of Goods:
Dubai blue sky hotel project is the highest hotel building in the world, covering an area of 3662 square meters and a building area of about 102000 square meters. It includes 1100 hotel rooms, 320 meters high-altitude open-air swimming pool, 360 meters high-altitude restaurant and 5-level high atrium hanging garden. The structural design is complex, the construction is difficult and very cumbersome.
Shipment of CAT D4H Bulldozer Swamp Shoe Date: 11th, February, 2021 Description of Goods: 142 Piece of CAT D4H Bulldozer Swamp Shoe Total Weight: 3 TONS
Wear of the crawler track. Wear between the track pin and the pin bushing is inevitable, but this wear will stretch the track pitch and make the track too large. If this wear continues, the track will move sideways, causing wear on the idler, track rollers, and sprockets, while also exacerbating the wear on the track pin and bushing.
In the grand blueprint of infrastructure construction, every rotary drilling rig plays a crucial role. But have you ever wondered why some equipment can operate consistently and efficiently under harsh working conditions, while others frequently malfunction? The answer often lies in unnoticed details, such as the unsung hero of the rotary drilling rig – the chain guard.
Tired of constant downtime and rising maintenance costs caused by undercarriage failures? We understand how critical reliable undercarriage components are to your operations. That’s why we supply top-quality Mait HR180 undercarriage parts engineered for durability, performance, and seamless integration.
A regular customer from the United Arab Emirates, cooperating for many years, has been buying parts from us continuously. Recently, they ordered 2 complete sets of KR806-4 undercarriage parts, some are customized parts with drawings. Now all the goods have been sent to Qingdao port, have been released from customs, just waiting for the vessel departure.
As a supplier of undercarriage parts for rotary drilling rigs, we understand that customization is key to enhancing performance and longevity. To streamline the process and ensure precision, here’s how we optimize customization based on your specific needs:
Date: 21th, January, 2021 Description of Goods: Sumitomo LS118RM Crawler Crane: Boom Insert 6m, Boom Insert 3m, Boom Top (with 7 pulleys, bearings, 2 axis), Boom Bottom. Total Weight: 3 Tons Load: All 4PCS BOOMS ARE LOADED IN 2 40HC CONTAINERS Packaged Photos:
Recently we got feedback from one of our customer. They said the CAT D9R undercarriage parts all successfully installed.